Greenfield installations

Greenfield installation: delivery governance from design to handover

One overview of schedule confidence, test readiness and open risks before factory acceptance starts.

Illustrative example · fictional data

The situation

A fictional greenfield production line is being built in several packages. The client wants one clear overview of schedule confidence, test readiness and open risks before FAT starts.

Project phase

  1. Requirements

    Done

  2. Procurement

    Done

  3. Installation

    In progress

  4. FAT

    Open

  5. SAT

    Open

  6. Handover

    Open

Delivery confidence (0–100)

  • Schedule58
  • Cost control74
  • Documentation61
  • Test readiness (FAT/SAT)45
  • Handover preparation52

Findings

  • 1. High

    FAT scope is not yet agreed with the supplier

    Acceptance criteria exist only as a draft. Without a signed scope, a failed test cannot be judged objectively.

  • 2. Medium

    Progress is reported by package, not by system

    Packages can be 90% complete while no system is ready to test. Reporting per system shows real test readiness.

  • 3. Medium

    Spare parts and training are not yet planned

    Both are usually discovered at start-up, when changing them is expensive.

  • 4. Low

    Punch list has no agreed categories

    Without categories, minor items compete with start-up blockers for attention.

Action plan

Quick wins

  • Agree FAT scope and acceptance criteria in writing.
  • Define punch-list categories (A, B, C).

Medium effort

  • Report progress per system, so test readiness is visible.

Higher effort

  • Plan spare parts, training and operator documentation as part of the handover scope.

Risk register

Likelihood →

4
1
3
2

Impact →

  1. 1

    FAT delayed by unclear scope Score 16 (4×4)

    Mitigation: Sign off scope and criteria before the FAT date is fixed.

  2. 2

    Late equipment delivery Score 12 (3×4)

    Mitigation: Weekly supplier status with an escalation route.

  3. 3

    Operators not trained at start-up Score 9 (3×3)

    Mitigation: Schedule training against SAT, not against handover.

  4. 4

    Documentation gaps found at SAT Score 12 (4×3)

    Mitigation: Check the document list per system two weeks before SAT.

Recommendation

Proceed to FAT only after scope and criteria are signed off. Switch progress reporting to systems and review again two weeks before SAT.

What you receive

  • One-page delivery dashboard per phase
  • FAT and SAT scope with acceptance criteria
  • Risk register (likelihood × impact) with mitigation
  • Handover checklist owned by the future operator